Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts

Tuesday, July 30, 2013

Midsummer Updates

Wow - time sure flies! Somehow I managed to miss 4th of July and wouldn't have known it was my birthday except for cards and emails LOL. Losing track of the date & day is a hazard of living off the grid out in the boonies, especially when the sun doesn't set in the summer or rise in winter.

Anyway, thought I'd drop a few lines letting everyone know what we have haven't been doing.

Well, this year has been back-to-back plagues for sure. All spring we were battling some weird funk, which turned out to be mini-epidemic of strep and whooping cough that was going around in Manley. We never came down with either fully, but it knocked our immune system for a loop so we got every other cold, flu and poor G-man's allergies were rampant. So we finally get over that, in time for a ultra-heatwave, a plague of carpenter ants and a truly obscene amount of mosquitoes... still battling those. We headed up to Fairbanks early July, and picked up a few obligatory injuries and lovely case of food poisoning. So, we're just now starting to feel ourselves again and getting our energy back. Of course, I suspect that we're anemic due to Culicidae exsanguination every time we step out the door!

Our friends from Manley, Mike & Dana, moved down South in July and we purchased their truck... she's a baby version of (Red) Sonja, and we've dubbed her (Black) Betty. It's sure a load off our minds to have a second vehicle, and Betty's smaller engine also uses a lot less gas for small-haul trips. She's also a 4-seater cab, so I can finally take a trip without Ripley in my lap the whole way! And she isn't a lifted off-road truck like Sonja, so she's a bit smoother a ride on the road, and I don't need to pole vault to get up into the cab ;) 

Of course, we coordinated our supply trip into Fairbanks on the weekend they flew out so we could pick the truck up at the airport. Just after turning onto the paved portion of the Elliott, Sonja started pulling to the right, so we got out to check... O Nos! A flat... big sidewall puncture in the front passenger tire! We tried to plug it with our Black Jack kit, but it wouldn't hold pressure above 30 psi. So we finally drop our "full-size" spare and manhandle the back tire off, replace that with the spare, and then replace the front with the back... and then get the flat up into the bed of the truck.  This is where our injuries came from! See we have 38" x 15.5" x 16.5" mud & swamp tires and they're really really heavy. In comparison, the 30-ish full-size truck tire we had for the spare looked like one of those dinky donut spares LOL.

But we managed to get into town ok, and the awesome guys at Giant Tire (on Williams Gate off Richardson) actually had a good-condition used tire and rim that is exactly the same as the ones we're running, and they did a full patch-up on the punctured one so we have a spare that is actually "full-size" for Sonja; and shifted the standard sized spare over to be a second spare for Betty. All-in-all it only took a couple hours and a couple hundred bucks... which is freakin' awesome since our mud tires are around $500 a piece new and the rims are about $300. WHEW! We got lucky, doubly so since this is the first road flat we've had in over 4 years. But we got our share of bumps, bruises, strains and dislocations... and plenty of bug bites, too!

As for projects...

Well, the garden is out for this year, but we're planning to stock up on everything this fall before winter so we'll be ready in the spring.

We haven't gotten to the siding and outdoor electrical yet, or to the last bit of roofing left from last year, or the clearing and fences. It's just too hot and too buggy to be messing with that when we're not feeling 100%. But we have all the gear here, so when it cools down and the bugs die down a bit we'll get on it; and probably screen in the porches while we're at it!

We did manage to plumb in a water intake pump (thanks Big Sis & Jimster!) so we can haul our water in from the village well in big drums and pipe it up into the storage tank instead of lugging a bunch of 5-7 gallon jugs up the stairs all the time. We had to do a little bush engineering on the potable water hose fittings, but hey that's life out in the boonies and the #1 reason to have several boxes of random spare parts :D

We also finished building a baker's rack with overhead pot rack and beverage shelf in the odd corner on the other side of the propane range. Now I have heat-resistant shelves for each of my cast iron skillets and Dutch ovens so I can put them away hot where they aren't in the way and without risking rust. The overhead is for the few stainless steel pots with the kettles, canner, and woodstove box-oven on top. Finally, my big bottom cabinet is empty of all that so I can finally put my big mixing bowls away in there instead of crammed into the pantry... yay! more room for jars and cans!

I built a long gun rack with a pistol & ammo cabinet underneath that's mounted between the bathroom and pantry doors in the middle of the house. Might seem odd to some folks, but we need our guns handy from either the front or back door with all the moose and bears out here. So finally they're put away in a nice home of their own. Now I just have to figure out what to do with their Pelican cases gathering dust under the bed!

Our next big chore is getting our firewood up, which shouldn't be horrendously diffult, just a couple weeks of dedicated work and trips back and forth to Manley since they've got tons of free-for-hauling logs at the new airport. We had to wait until the trail to the site was thawed, then agains for our trail and driveway to dry up enough, and then WHAM! on came the heat! No worries though, we'll get it done in time :D

We're still hoping to get the sheds up properly, since the ad hoc tarp-shedlet-enclosure-thingy we threw together last fall when the snow flew leaves a lot to be desired in terms of space and weather tightness. The hardest part is going to be moving the one shed down from the tent clearing -- it was a PITA to put together, so we really don't want to take it apart to move it. We'll figure something out I'm sure... heck, we still need to get the skid foundation cut in and leveled, so we might be able to slide it off the gravel pad directly onto the skids and then drag it back with Willow (the ATV).


While we've gotten a really slow start and feel a bit like slackers, it's better not to risk serious injuries and longer convalescense by pushing ourselves to complete non-critical projects that can be postponed or scaled back. Maybe if we lived closer to the hospital and were within cellular or ambulance range - ROFL!

Now, if we can just keep Ripley and Jackson from wanting to come in-and-out-and-in-and-out bringing those hitchhiking bloodsucking fiends in with them :D

Wednesday, May 22, 2013

Summer's Here and New Family Member

Summer has come after only a few hours of spring. Seems like it went from snow-covered and 20F to squishy and 50F overnight. Despite a fluke snowstorm last Friday, our temps are consistently above freezing already so the Summer Project Rush is on!

Friends of ours are moving back to the L48 and we've adopted their kitty, Jackson. He is such a little lover and already knew us from our many visits, so he's fitting into our household like a champ! Unfortunately, Ripley is having difficulties adapting to a new sibling and having to share Mom & Dad's affection and attention. We're hoping her bitchiness is temporary and she'll come to accept Jax without any serious damage occuring. In the meantime, they seem to have reached detente... the upstairs is primarily his and the downstairs is primarily hers, but all food is apparently Ripley's (at least she thinks so!).

When we were in Fairbanks in March,  no one had any gardening stuff in stock since it was still winter; and we haven't been able to get back up since due to a leaky transfer case. We aren't planning another trip up for a couple of weeks, so it looks like we'll be limited to only a few fast maturing crops or having to get garden starts from a nursery ($$$$). Our gardening plans for this year may need to be postponed (AGAIN). But at least we know to stock up on supplies before fall so we can get our early start next spring... including seed potatoes, onion sets and garlic sets which are painfully difficult to get up here (must be certified disease-free, preferably Alaska-grown) and impossible to find for spring planting even though nothing overwinters here so fall planting them is not an option.

Once we do some minor repairs to the truck's transfer case, we'll definitely have to get cracking on the firewood. Luckily, there is plenty of logs available free-for-the-hauling at the new airport project site. We just need both the truck and the trail to be in good shape to go get them. With a week or two of dedicated effort and a multitude of trips back and forth to Manley, we should be able to put up enough for this year and maybe even get a head start on next year's... in any case, I want to make sure we have so much seasoning wood bucked, split and stacked that we don't have to play "find the deadites" when it's below freezing again!

We're hoping to get the siding up on the cabin, and the two decks enclosed and screened. With extremely good fortune and good weather, we may even be able to get all the trim done and get everything painted (outside).  Finishing the drywall and painting on the inside is still a ways off since the outdoor projects take priority during our short summer... I might be able to get the interior work done during the winter, but G-man would die with his asthma and allergies :(

NOTE TO FUTURE AK HOMESTEADERS -- consider interior wall surfaces that do not require extensive sanding and finishing (like ply or plank) if one or more members of the household have congestive/pulmonary issues!! The money you save getting cheaper drywall isn't worth the hassle and continual delays (unless you actually enjoy staring at unfinished sheetrock for years - ROFL).

We're also hoping to finishing clearing the home acre and get the primary fence up. Since this is an actual containment fence for Ripley, the fence has to be solid and strong... so a jackleg fence is out this time. That leaves deadhedge and wattle fencing, so we're debating which would actually be the fastest to build and strong/solid enough to keep the beast in! I think we've settled on deadhedging for the perimeter fence, piling all the spruce brush from the clearing roughly a foot thick and 4 feet high between two upright poles we pound into the ground every few feet. I'll save the prettier, and more time consuming, woven wattle for the inner fence around the garden.

Thursday, February 28, 2013

Where Did February Go?

... battling freak weather extremes and an underestimation of firewood, that's where!!

We had to deal with days of -40 with high winds, days around zero with lots of snow, days of almost above freezing with blinding sunlight... rinse, lather, repeat. All that cycling made things weird for travel by foot as well as vehicle since the accumulated snow would start melting in the sun, then freeze solid, then get covered with fresh powder which results in thigh-high drifts, ice ledges, bottomless pitfalls and no traction anywhere.

Plus, we never knew what the temps were going to be when we went to bed so had no idea whether to bank the fire (and risk roasting) or let it burn out (and risk freezing). Even in the course of a day we;d see 30-40 degree shifts, which meant lots of small short fires... which strangely burn up more wood than a long burn with a full firebox. Normally we don't get that sort of weather and random heating fluctuations until mid-March, so we ran a little short on firewood (AGAIN!!  Arg!!).

So, off we went trudging through snowbanks in search of more deadites for the woodbin. This combo has a few serious limitations... not only is it difficult to determine where you're going and what's under your feet with any given step, it also means that you can't collect with a vehicle (may be possible with a snowmachine, but we don't have one yet). So, we were stuck dragging a sled of wood through the forest while the sled keeps trying to sink and mire in the snow, and you keep stepping through the hardpack or losing your footing where it's powdery or their are hidden stumps. And, unless you want to completely exhaust yourself, it also means that you can't load up the sled too much or you'll die trying to drag it home. Ultimately, we've found that we can only drag back a sled with 1-1.5 days worth of wood... so this whole process is DAILY (now you know why I'm peeved about the miscalculation!!).

In addition to the wonders of firewood, we did manage to get a few random projects completed (or at least started).

The first was a warming hut for our generator... seriously, it's cold enough at times that the ppor thing won't run... so we built a box out of scrap 2" foam insulation with vents cut out for the exhaust and intakes.

Second, I turned the laminate countertop scrap (the cut out to install the sink) into a makeshift baker's rack for the odd corner next to our new gas range. Eventually, I add some shelves to the frame to store the cast iron that's too heavy to hang, and also some shelves above it to make a hanging potrack for our stainless steel & copper... it'll be soooooooo nice to get all of them out of my limited cabinet space!

I also purchased some battery-operated, self-stick, light-detecting, motion-detecting LED nightlights for our stairwell. The lights are low lumen and angled down, so they don't blind you or wake everyone in the house up whenever you need to go up or down the stairs in the dark (yeah, I've busted my ass a few times on moonless nights!!). They came in a set of 3 so I installed one on each flight and one on the landing, and have been really impressed with how well they're working so far to light up the entire staircase just enough to make things safe. Of course, they still freak Ripley out when she's slinking up and down the stairs at night since they're automatic... poor baby!

I also modeled a storage shelf and desk unit to wrap around the stairwell upstairs, and a utility cabinet to hide and secure the battery bank and water tank on the opposite wall. It would have been easier if we could have purchased a pre-built unit, but with the angled walls in the loft created by the gambrel roof we pretty much have to go custom with everything. Hopefully we can get to those two units sometime this summer, although this summer is going to be focused primarily on the exterior siding and landscaping/garden. (I'll be starting my seedlings this month, so I'll try to do a few posts on our gardening planning for you guys).

We did manage to come up with a workable semi-prebuilt solution for storage shelves down the angled walls on either side of the bed, though. We bought 12' sections of wire shelving in the three sizes that were available (22", 16" and 12") and then made vertical standards for the front from 2x2's screwed directly into the floor and rafters. We had to attach the front of the shelves to vertical standards because we couldn't use the regular shelf supports on the angled wall, and the three sizes allowed us to place a deeper shelf on the bottom, with narrower shelves following the slope... we lucked out and this ended up with all three shelves almost perfectly 18" apart. Instead of the normal "J clips" normally used to attach the back of the shelf on a vertical, we used "U clips" over the back wire that would support the shelf regardless of the wall slope. The wire shelves are also just fleixble enough to bend over the weird waviness created by uneven rafter depths (rough lumber rather than planed), if we'd had to scribe and custom fit plywood shelves to the wall I would have lost my mind!  All-in-all, going with the wire shelving probably saved us around $50 and a day of labor over plywood, so that's a bonus. Anyway, we got the shelves on my side of the bed installed, and will be installing G's when we do the whole winter-to-summer bedding and clothing switch.

While I'd love to have things all done and properly finished (still haven't mudded and painted the walls or trimmed out the windows & doors), I figure it's better to work on weather-proofing, storage, and food production first. Safe, organized and productive first, pretty later :)

Saturday, September 29, 2012

Porch Construction... PICS!!!

We changed the orginal porch design from 4' deep to 6' deep with a center bay 8' deep (forming a 2' stoop at the top of the stairs). Because of the integrated roofline, we had to get the porches on before we could FINALLY paper and shingle the cabin roof. Since it rained all summer, construction and subsequent roofing was delayed... so it got to rain INSIDE the cabin as well. Seriously! I had rain chains attached to the ceiling joints in the living room/kitchen to divert the leaks into buckets.

Anyway, I, um, "misplaced" the camera during the construction of the western (front) porch, but managed to take pics of the eastern (back) porch when it wasn't rainingl and they're identical, so no harm done. Again, we're using surface pads and piers for the foundation. This time the pads are a sandwich of pressure treated 2x4 and plywood with precast concrete piers instead of reinforced concrete pads and poured piers like we used on the cabin since the porches are much lighter. The cabin's surface foundation has proven quite stable and effective with barely any shift despite a rainy summer, a fast freeze-up, an unusually cold and snowy winter, an extremely wet and slow break-up, and another rainy summer... so we're confident that the porches won't go anywhere either.

Since we didn't want to waste a lot of time and effort leveling the pads and pier jacks after building the deck, we opted to build the deck first in 3 independent square frames, attach each frame to the cabin's sill beam since it was already level side-to-side, use temporary braces to level the deck frames front-to-back, and then drop the posts into the pier blocks through their corresponding slots in each of the deck frames and plumb them up before nailing them to the already-leveled frames. Then we came back and shored the posts up with cross ties and angle braces.

This method worked out pretty well for our two-man team without a flat surface to start with, and certainly went faster and smoother (and more level, plumb and square) than erecting the posts and beams first and dropping in the joists second like we did with the cabin floor. Just one of the many benefits to designing and building on a modular grid!

Floor frames built first and then attached to the sill beam.
Pads, piers and posts placed after the frames were attached.
Ripley, sneaking into the shot again!
We added cross-ties in front and back of the posts under the joists as extra insurance, and angle braces to prevent racking.
We attached the stairs to the stoop with an extra riser nailed through the rim and joists on the inside of the floor frame.
Then angle-braced the nose of the cantilever back to the posts just to make sure everything was solid.

AND we put the decking down FIRST this time, so I wouldn't be able to fall through like I did on the western porch! 
Double-checked that the posts were plumb side-to-side and tied them together with a header plate on the inside and outside.
Then checked plumb back-to-front and tied the porch posts to the cabin posts -- yay for the modular grid again!
Trimmed off the tops of the post and added the rafters, with an angle brace as extra support on the flying rafters.
The roof overhangs the deck nearly 2' on all sides, except right over the stoop where the deck sticks out a little;
and that little bit won't be exposed too much after we get the gutters on.
Then it was just a matter of adding sheathing, drip edge, tarpaper, shingles and flashing to finish up the whole roof.
Technically, we didn't need metal flashing on the valley and pitch break since shingles on gambrels are usually just bent;
but since the lower rafters are nearly vertical, we opted to flash it like a roof-wall connection rather than an adjoining roof.
So here's the front (south) dead-on with both completed porches.

LOL - kinda has an Amityville Horror thing going on from this angle!
Now, if I could just get James Brolin or Ryan Reynolds to come split that mound of wood for me!!
And oblique angle from the SW corner, which shows the roof better.
Yes, our cabin is really that small and our truck is really that big ROFL!!

And the back porch with the siding installed (hmmm, to paint or stain, that is the question).
Remarkably, we managed a halfway decent job keeping the shingles even, straight and smooth!

We'll be adding the siding on all faces eventually, but might not make it before the snow flies this year. With winter coming, the worst of the rainy season should be over, so we're not panicking to get the gutters up either; but we'll have straight gutters with a downspout into collection barrels on the south end for watering the garden with sun-warmed rainwater, rather than the near-frozen hard water that would come up from a well.

Friday, September 28, 2012

Clearing Brush ... more PICS!

Clearing brush for access, construction and fire safety has been our constant occupation, especially since we've had such a rainy summer.

In order to preserve the critical vegetation mat, we're clearing the home acre by chainsaw instead of with heavy equipment. As you'll see by the mountains of brush, it's a LOT of cutting and hauling... and we still have the eastern half-acre left to do!!  Eventually we'll be sorting all the brush into separate piles since we plan to use most of it to weave a wattle fence around the home acre and veggie garden. Good thing that the spruce right here is smaller diameter, very straight, and very supple! The few bigger trees (4+ inches) will become firewood (or go onto a bonfire if it's punky) and all the random little bits and slash from limbing out the fencing will get mulched to fill in low spots along the driveway (no mulch near the cabin, it's a red carpet invitation for carpenter ants and cabin fires!!)

We were lucky that G's folks helped us out with some of the clearing on the NW corner during their visit... but it's just not right to force houseguests into slave labor even if they are family :D   Now we'll need to haul "Mount Wardle" from the NW corner to the "Wall o' Brush" long the southern border so we can put our storage and wood sheds in the NW corner easily accessible from the front porch.

The end of the driveway, as far as we got last year other than the immediate cabin construction site.
The southern border, extending east from the driveway, and the tail end of the Wall o' Brush.

The Wall o' Brush extending 100' from the driveway, 4' high and 8' wide.
And that's just HALF of what we've cleared, which is only half of what we need to clear.
The western border, extending north from the driveway up to Mount Wardle.
And Ripley, sneaking into shot again!!
Mount Wardle -- all the brush from the NW corner.
Don't be fooled by scale, this pile is nearly 8' tall and 20' in diameter!
That blue tarp right in front of it is covering a *full pallet* of sheathing.
Alas, we've only made it to the corner of the back porch... we still have nearly all of the eastern half-acre to go!
But at least we have a little more of an opening outside the front porch now instead of being claustrophobic in the trees!
And for some perspective and scale... this shot was taken from the back porch roof and shows the entire SW corner (nearly 1/4 acre) with Sonja (our full-size Dodge pickup) in the foreground. It was all just as dense as the surrounding area.
Phew, just looking at it makes me tired all over again!!

Wednesday, September 26, 2012

Adapter Found - finally PICS again!!!!

Yay! While preparing for G's parents visiting, I finally found the camera's card reader so I can finally post pics again :D

I'll start with a few random shots of indoor stuff from previous posts:
Our 200 gallon water tank up in the loft so we finally have running water (gravity-fed, not pressurized).
The pantry shelves. Eventually I'll get these painted and better organized!!
Adjustable spice shelves I built to fit between the wall studs in the pantry. No space goes to waste in a small cabin!
Our tiny bathroom under the stairs. Two-seater bench holds the poo bucket and urinal.
Note the narrow sink we made out of a fish-steamer, which still needs some work to drain properly.
Honey Bucket, not to be confused with....
... bucket of honey :D
The perfect pee-tainer, a 3-gallon outboard fuel tank.
Complete with sturdy handle, fill gauge and threaded liquid-tight cap!!
View from the "throne" - very untidy understairs storage at the moment.
BTW - I highly recommend the 'Gourmet Liquid' ant bait for Carpenter Ants!!
Obligatory picture of Ripley, she's such a camera whore!!

More posts and pics soon!

Monday, August 13, 2012

West side -- Done!

In spite of all the rain delays, we've finally finished the western porch and have the western roof felted and shingled up to the ridge. Today, we're starting on the eastern porch. With any luck (and continued clear weather!), that one will go up much faster than the first one and we'll have the whole roof felted and shingled by the end of the month.

My back is mostly fine now, just have to be careful not to twist while carrying something heavy or to sit down too hard since my tailbone is still a bit bruised. True to form, I've gone on to damage myself on other projects... like slamming my right index finger in the truck door while we were in Fairbanks picking up more lumber and our new range (thanks, Mam!!). It's a lovely shade of indigo and I'll likely lose the nail, but I can still bend it and just have to be careful not to jam it on anything. Thank goodness I'm ambidextrous!  (whether I'm ambi by nature or because I'm constantly smashing my hands is another question altogether!)

Our new range is awesome... or would be if we'd known, while we were still in Fairbanks near a hardware store, that it had an odd-size gas fitting and that we needed to get an adapter for our LPG line to hook it up. Ah well, we'll get that next time we're in town; but in the meantime, the range looks gorgeous in our kitchen :)

We also got a visit from some of our followers, Jeff & Betty, who are vacationing in Alaska.It was nice meeting them and talking about our adventures. Unfortunately, we got stuck in Fairbanks with a busted catalytic converter and couldn't make it back down here to hook up with them again. We cut out the cats and installed straight-pipes (no emmissions regulation in our neck of the woods!) so the truck is running again at full power, but one of the new joins worked loose on the exceptionally bumpy way back home due to all the road work, and we need to fix that again before we head into the village again. Hopefully, Jeff & Betty aren't still sitting at the Roadhouse waiting on us :(

Friday, July 20, 2012

Balance & Coordination -- >> EPIC FAIL

Ah, another glorious Aspergers moment during construction. Today while we were sheathing the porch roof, I fell through the joists, pulling the ladder and some of the scaffolding with me -- TWICE. Poor G was stuck up on the roof freaking because I took out the ladder, so he couldn't get down to check on me.

DON'T WORRY!! I'm banged up with a few bumps and bruises, but reasonably fine. Good thing I was on the deck and only fell 2 feet, instead of on the roof and falling 10 feet. Plus I have TONS of experience falling, so I'm fairly good at doing the kitty-cat mid-air twisty thing to end up with the least amount of critical damage possible.

This is my life. In addition to those social issues and sensory processing issues, probably one of the worst side-effects of having Aspergers syndrome has been my difficulties with balance, motor coordination (kinetic apraxia / dyspraxia), and knowing where my body is in relation to other things around me (proprioception). Running into doors, corners & walls; tripping over ANYTHING and EVERYTHING; stepping off stairs, curbs, ledges; setting things down too hard, or too high, or just shy... it's a thrill a minute, folks :D

And yet... I am still here, and still have all my fingers & toes, and both eyes. Granted, I've broken all my fingers & toes (and hands & feet), sprained nearly everything that can be sprained, chiropractors cringe when they look at my spinal X-rays, and I have more scars than I can count...

But, hey, the show must go on and I haven't given up yet!! I just have to do things weirdly or go slow sometimes ;)

Tuesday, July 3, 2012

Wherever did June go?

Busy busy is the name of the game this past month.

G & I have spent nearly every non-raining hour outside clearing the trees and brush from the acre around the cabin. Then hauling and stacking the piles far enough away from the cabin not to be a fire hazard. We're planning to use the majority of the spruce to fence in our square, eventually....

I've also been dedicating a big chunk of time to (re)designing the two side porches so we can finally finish the cabin roof. With multiple ways to complete the project, it was just a matter of figuring out the most efficient use of materials, logical completion (i.e. the way BOTH of us agree on - no small feat) and splitting up the project into discrete portions where the necessary materials could all fit in a single pickup load and still have a safe and viable product until we can come back and finish the next stage. In tandem with that, I've also been designing the 16x16 larder we're planning to add onto the back/north side of the cabin to house our DC freezer and long term dry goods. The 7x7 pantry inside is great and holds a bunch, but we just need more room to securely store 6-12 months of food plus all the food preparation and storage paraphernalia... you'd be surprised how much space canning equipment actually takes up!

I've also been slowly working on finishing up the kitchen so we have a more fully-functional cooking area. No easy task since our local home improvement mega mart never seems to have the off-grid LPG range we want in stock. They have the huge model, or the standing pilot model, or the AC glow-bar ignition models... but not the small piezo/electronic ignition model.... grrrrrrr. The model we want is under $400 if we pick it up in the store, but nearly double if we have it ordered and shipped.... grrrrrr. For the extra cash, we could actually buy the really nice model we truly want with the 9v ignition (no AC required at all, not even for the oven). But the kitchen work is a bit of bother since I was recently asked to be a quest writer for one of the blogs I routinely follow (MyFoodStorageCookbook) while the author, Megan, is on maternity leave. It is very difficult cook (and to write cooking articles) without the use of a proper kitchen and all the gadgetry, but that's sort of the whole point to food-storage and related "prepper" blogs isn't it?!!

G & our friend, Paul, pulled Sonja's back axle and replaced the bearings and seals. Upon further inspection during that ordeal, it seems the demise of our rear brakes was greatly exaggerated... lucky for us, it looks like a good cleaning is all that is really needed and the current shoes and springs are perfectly serviceable. We're still looking at permanently welding some of the front suspension and steering systems, and replacing bushings, etc; but the short-term spot welds seem to be holding. Continuous off-road driving in extreme weather conditions is not for the faint of heart or the weak of construction! In any case, G felt that it was safe enough to (finally) head into Fairbanks for a supply run as long as we didn't drive too hard or heavy.


So we had a big run up to town to load up on food (***fresh*** food) and lumber. Lucky for us, our friends Darrel and Linda put us up while we were in town and babysat Ripley while we ran errands. It's awesome to have great friends who let you bathe, feed you real food, and love on your hyper 125lb poochie while you're away. And true to my usual form... I did make a full load of groceries and a full load of lumber ALL fit in the bed of the truck despite anyone's doubts ;)  And Sonja made it home just fine with no mechanical issues; she wasn't even too overly-burdened. The best part... we could also finally drive her right to the cabin for off-loading since most of the trail and driveway has dried out --- HOORAY!


So, we'll be spending all our non-rainy hours the next couple of weeks building the porches, and all the rainy hours inside cooking and food-storage blogging... and hopefully getting more odds & ends completed in the kitchen and electrical system :)

Sunday, May 27, 2012

OMG -- RUNNING WATER!!

Nearly 3 years and we finally have cold-n-cold running water ON TAP in both the kitchen and bathroom SINKS.

We filled up the big tank with 25 gallons (the minimum) and are leaving it to test the PEX lines and junctions for leaks... so far, so good. We barely have 2.5 psi of water pressure with virtually no head (maybe 6' of fall), but once we add the remaining 175 gallons that will add another 3' of head and get us closer to 4 psi.

I don't care that it's room temperature and won't blast out of the faucet... I don't have to wash my hands with a jug and basin or do dishes in a tub anymore, and that's just FREAKIN' AWESOME!!



Friday, May 25, 2012

Mud, Carpenter Ants and Storage

So far, this spring has been the least muddy since our arrival. Although we had a ton of snow which melted really fast, most areas drained and dried up within the last few weeks with all the sun and wind. Unfortunately, there are still some really nasty boggy spots on the main trail, our driveway, and the clearing where we had the tent. We've left the truck up at the road** and settle for getting pelted with mud and melt hauling back and forth on the ATV. Everything we own is covered in fine mud dust, you just can't stay clean in the bush. With any luck, the rest of the bad spots will dry and firm up enough to start driving the truck back again soon.

**Our neighbors got their truck stuck up to the hubs on the way back out, about 2/3 up the trail. We tried jacking it up with the hi-lift and jamming logs under the wheels, but since there is no bottom to the mud, everything just kept sinking again and again... including us -- YIKES! A friend of theirs drove down (over 3 questionable areas) and attempted to winch them out, and then to jerk them out... no dice, she was stuck good and the tow vehicle was just spinning in the mud. Eventually, they got a dozer from the Village Council to come extract them... no small feat since it's evident from the huge tractor ruts now torn out down the trail that the dozer was at serious risk of sinking as well. In any case, they're out now, but the poor trail is in bad shape.

The mosquitoes took no time reestablishing their bloodsucking horde, so it's been a thrill working outside for any long periods. I think we're anemic LOL. And the carpenter ants are back in full force. I'm loathe to use insecticides, but our house and lumber are at risk... you'd think with 80 acres of forest, the little buggers would have plenty of lovely places to eat and nest besides our house!! So, I've put down some organic mosquito pellets (Bt bacteria that targets the developing nymphs), and some non-organic ant bait and perimeter powder. At least with the bait spikes and powder, I can apply directly to the tops of our piers and right under the lumber stacks and minimize the risk of Ripley getting into any of the poison. Sigh -- I wish the organic ant powders had worked. We'll be doing extensive FireWise clearing around the house soon, so hopefully this will further eliminate any stumps and debris near the house that's keeping them nearby and a nuisance.

We finally gave up trying to mud and paint before building the interior storage spaces we desperately need. So, we forged ahead and banged out the pantry shelving and built all the cabinetry and shelving for the "bathroom" - including a new loo cabinet for our poo bucket with a separate urinal. We fabricated the urinal basin from a steel mixing bowl and a sink drain assembly, and it's nice to finally have a proper toilet seat again (if only so the male members of the house can enjoy leaving it up). Since the space is so narrow under the stairs, we couldn't fit in a conventional vanity and sink, so we ended up devising one out of a fish steamer. Once we get the kitchen plumbed, it will be nice to finally fill up the 200 gallon water tank in the loft and have running water again! All the wiring on that circuit is done, with the exception of hanging the light in the staircase, so it won't be long before we can hook up the trunk line to the breaker box and see were I screwed up wiring any of the switches and outlets :D

Next on the list is adjusting the kitchen base cabinets, installing the backsplash, and (finally!) dropping in the double sink and plumbing the faucet. Since we've decided to get a small propane range to supplement the woodstove in the warmer months, we'll be rearranging the cabinets so that the 24" one is on the end and we can tuck the propane bottle in it during the winter when it's too cold to have it outside (yes, it does routinely get too cold for propane to flow in Dec/Jan). The last bit of that wall will have a custom built baker's rack-type thingy since we discovered that storing cast iron skillets and dutch ovens inside a cabinet was sub-optimal. The new rack will have individual cubbies for each piece (no stacking) and be lined with silicone mats so we can put them up hot if necessary. The baker's rack will also give us some additional space to put a very small microwave for quick warm ups, since the electricity (and generator fuel) for that operation is actually cheaper than firing up the propane stove every time we need to reheat our coffee... the insulated steel airpot carafe keeps it warm enough to be passably drinkable for several hours, but not warm enough to melt the creamer -- PITA.

All the finishing touches and prettifying will just have to wait. As will the garden. This summer we really have to focus on getting all the plumbing and electrical hooked up, FireWise clearing around the cabin, getting the porches built so we can finish the roof properly, and getting sheds & exterior storage in place... and, of course, laying in firewood. Safe, secure and operational is more important than aesthetics at this point (although it pains me sometimes). With any luck, all this new storage will allow me to properly unpack and organize all the crap we just dumped inside the cabin when we moved down from the tent... AND I can find the adapter doohickey for the camera so I can get pictures on here for ya'll :)

Wednesday, October 26, 2011

Warm and Toasty

We started to move into the cabin this past Friday once it became apparent that the snow wasn't likely to stop. It's been sooooo nice sleeping in a warm, dry and level place again!! We've been scurrying around moving the essentials from the tent with the truck and ATV, and getting rudimentary utilities set up down here at the cabin. Got the battery bank and inverter moved (ow ow ow - pulled muscles!!!) and the electrical panel with a couple circuits wired so we could get the satellite dish mounted and internet back online.

We'll be rushing around the next few days to get the rest of the electrical wired and our water tank/plumbing sorted ahead of the forecasted winter storms headed our way. Once that's done and we can organize the living space so we're not tripping and climbing over boxes, totes and buckets, I'll write up a longer status post with the many pictures of our progress (yay, I found the camera's card reader) all from my new cushy recliner!! Imagine, real, comfortable seating again instead of folding camp chairs... what luxury!!

We can worry about getting the non-essentials and the tent down to the site and getting the rest of the drywall and flooring done in the pantry and bathroom; and doing a bit of additional clearing and organizing outside before the snow gets too deep, etc. All the remaining interior finish work can keep us busy during the long winter... and we won't even have to freeze doing it this year, or have to work with Gumby Gloves and Frankenboots on -- WooHoo :)

Monday, August 29, 2011

Fair Weather Fun... sort of

G & I got most of the wiring run through the joists and the two interior walls while it was raining. You'd think that would be a fairly easy task, just pulling some Romex, but noooooo... not when you take into consideration that we're trying to run the maximum outlets/lights on the minimum amount of wire, without overloading any of our few circuits or potentially leaving ourselves in the dark if we turn something on a pop the breaker, and not drill too many holes in the same stud/joist, and keep the wires as hidden as possible... all while being two of the most OCD and contrary planners in recorded history. There are times where we just do not communicate and work well together. Of course, the freaky differences between US and UK standards doesn't make things easier since G got his EE degree over there in the land of 220v wiring ;)

Anyway, we were going to start on the flooring so we could move in by Labor Day (Sept 5 for you non-Americans LOL); but had to take advantage of a fortuitous break in the rain to do a little work on the roof which has been suffering under an infamous Alaskan Blue Tarp since December. Needless to say, a few wind storms and a lot of UV exposure later, it's protective coverage was patchy at best. So, when the glorious sun finally peaked back out of the clouds, we scrambled up the ladders to yank the poor shredded thing off!

Then it was a matter of trying to install the self-adhesive rubberized ice shield on the rake, ridge and pitch breaks. Yeah, if only it were that simple. Seriously, this stuff sticks to everything except the roof, and it especially likes to stick to itself. And that "easy" release paper... yeah, uh-huh... kept shredding instead of peeling, and of course it had to shred right in the middle so we'd have to fight with it the whole time while it tried to adhere to us and itself. All while balancing precariously on a 7:12 pitch in the wind. We're talking some serious feats of Peter Parker Prowess.

And poor G-man... found yet another building material he's allergic to. Poor bugger was breaking out in hives before we'd even finished the rakes, so it was quickly back to the tent to wash him up and pop some extra-strength Benadryl. Needless to say, it took us 4 days to lay down 7 strips.  We also nearly created the world's largest glue-trap when a piece flipped over, stuck to itself and then blew off the roof... almost snagging poor Ripley who was anxiously pacing at the foot of the ladder below.

But the membrane is down, with the minimum amount of weird wrinkles that we could manage, so it should keep those joints from leaking again. Now all we have to do is drag the new Ultra-Duty White Tarp up there and get it spread out evenly and tacked down so we can protect the rest of the roof this winter since we couldn't get the porches on and, therefore, couldn't actually get the tarpaper and shingles on. At least this tarp is much thicker, covers the entire roof (and then some!), and is UV stablized... but it also weighs about 100 lbs. Since I'm better at hauling materials up and down on the ladder, I'm going to have to figure out how to wrestle some bulky thing that weighs almost as much as I do up there. Joy!! Let's hope it's not windy THAT day!!

But, we can hold off on that tarp for a couple of days and (hopefully) get back to the floors so we aren't delaying our move in date too awfully much ;)

And, I promise promise promise, as soon as I recover the fugitive card-reader from it's hiding place at the cabin, I will post pics of all our progress!

Tuesday, August 9, 2011

Time flies while it's raining

Well, we have our stairs in and most of the drywall installed. Were planning to install the floors this week, before mudding the drywall and painting the walls, so they could get dry and acclimated before sanding and finishing. Everything was starting to click along...

But Noooooooo... it absolutely had to RAIN again. Grrrrrrr  We got a brief respite from the rain yesterday, but needed to go into Manley which wasted most of the day.

We don't want to drench the flooring hauling it into the house, plus we have to move some stuff outside into the rain to do that (and hope we can tarp it before it gets soaked through). Can't finish the mudding the walls because it won't dry. Can't properly install the entry doors because that means taking them off and exposing the inside of the house. Can't pickle and poly the kitchen cabinets because it's too humid. We're at the stage where most of the tasks are either outdoors or require good ventilation and relatively dry conditions. Booger snots!!

The only cabin projects we could really do during this weather are piddly things that really don't impact our ability to move in by Labor Day and could easily be done at Christmas or New Years or Easter. Arg :(

Heck, can't even do laundry... but the sheets and towels we had hanging on the line are getting rinsed really well. And it's a little too warm to go clearing brush or chopping firewood with a raincoat on.

But - on a positive note :)  Mr. Bear hasn't been around since I chased him off with the shotgun, and our neighbors finished a big enough clearing that we could move their camper to their property instead of behind our tent. Silver linings....

Tuesday, April 26, 2011

Rain, Break Up and Cabin Pics

Well, we got some rain today and it's raining again right now. Definitely amped up the snow melt around the place! Of course, we had to adjust our work schedule today so we could protect everything from getting soaked.

The guys finally dug all our tools out of the remaining snow and got the buried tarp enclosure put back up!



And they installed our first window upstairs because I got ambitious yesterday with 60F and cut out the hole in the house wrap and vapor barrier :)


(Tom hates ladders, so he actually got to hold the window from the inside while G-man played Spider-Man on the ladder outside)


The whole house is wrapped now, we just have to tape up the seams and get the doors & windows properly installed and we can start putting up the T1-11 siding.

(Tom's taken over Willow -- man has never ridden a 4-wheeler before coming here, and now he's tooling around like an old pro LOL)

I got the vapor barrier completely done and taped upstairs yesterday, so whenever we get the 8' drywall hung downstairs (or at least moved downstairs) so it's off the top of the stack, we can start hanging the 12' drywall in the loft.




Ripley really doesn't like it when I'm upstairs because the stairs aren't in yet and she can't get up there.



I did get the downstairs vapor barrier almost finished today... but we ran out with only 12' of the back wall left. DOH!!  Luckily, we can just do the rest of the room and leave a few of the 8' sheets off to the side out of the way to come back to once we go into town and pick up more vapor barrier. The primary thing was to get the east wall done so we could get the cabinets in! Still have to tape downstairs, and install the foam board around the rim joists, but that hopefully won't take too long.




So things are melting around the cabin....




But it's nowhere near as bad as around the tent...




Looks like we're going to get a reprise of Lake Wardle again this year, after all :(

But, hey, we did get a perfect example of frost heave. Remember that ditch we dug last year to drain the lake of melt and rain water we had in front of the tent? Well, it froze this winter and pushed all the soil in that area up... notice the layer of ice beneath the soil!



And one nice thing about living in the middle of nowhere... you can sight in your rifle right in your front yard while you're taking a construction break ;)





Our little cabin, so awesome even the heavens smile down upon it :)

Quick Update on the Cabin Progress

We've been enjoying Tom's company here for the past week and are slowly getting things done at the cabin. Tom's been more than up for hard labor, but I picked up a nasty tummy bug in Fairbanks and am now just getting back to rights. The guys have been keeping busy collecting firewood and running errands, and I've been doing my best to keep everyone fed (even if all I could do was get stuff out and prepped for the actual cooking by someone else).

We finished all the vapor barrier and taping upstairs today, and the guys started the vapor barrier downstairs while I cleaned up the loft. It's amazing how big the space looks again now that the tools are all packed away and the scraps are out on the pile. With any luck, we'll finish the vapor barrier and taping downstairs, then get the foamboard cut and installed along the rim joist and header beam so we can start the drywall on this week. Having a third set of hands, and a helper at least 6" taller than me, should make getting those 12' sections of sheet rock onto the gambrel ceiling upstairs much easier. Ideally, we'd use a lift to install the ceiling, but I couldn't find one for rent in town while I was in and they didn't know when it would be back in for re-let... oh well, such is life when you live remote.

Of course, the 12' drywall is on the bottom of the pile, so we'll probably have to start with the 8' sections downstairs first just to be able to get at them. Figure if we're going to move them anyway, we might as well move them straight onto the walls ;)  It'll be good practice for the harder task up in the loft. I'm really not looking forward to hanging drywall on the ceiling, it's probably one of my least favorite construction tasks. But at least once all the drywalling is done, I can get to one of my favorite tasks... painting. I know lots of folks hate painting, but I find it extremely peaceful and meditative... well, as long as I'm left alone to zone out and "git'er dun". Too bad I still need to tape and float all the seams first. I don't hate mudding, but it's not my best skill. Just hope the walls don't look like a 2nd-grader went crazy with the playdough ROFL

The temps have been high enough that we should be able to install the sill membranes for the doors and windows with a good chance they'll stick. So, we'll probably get those in before we start on the drywall, that way we can do a good job foaming and caulking around the jambs, and then just do a drywall return rather than messing around trying to do custom woodwork to extend the jambs since our walls are double the thickness of the average wall. We'll be putting in solid wood sills because Ripley is sure to trash them in short order looking out the windows doing her doggy thing if we don't. Sills are easy, but I seriously don't want to mess around with jamb extensions and case mouldings when drywall returns are so much easier and don't collect as much dust LOL (ya'll dust your trim mould regularly, right?!).

I promise to take pictures tomorrow!! I even have the camera lying on my clothes so I won't forget it again. Not really much to see at this point, but I know you all always appreciate the photos :)

Sunday, April 10, 2011

Electrical Diagram

Awhile back, we promised to publish a diagram of our electrical system here at the tent. Well, we finally got the laptop it was on fixed so I can post it for you :)


This is how we have our tent wired with only two AC circuits, one for lights and one for receptacles. It's usually a good idea not to have your lights and sockets on the same run, or at least not all of them, so that if an appliance blows the circuit breaker you aren't left scrambling in the dark. All the AC wiring starting from the service panel is standard, so you can refer to any wiring manual available at your local library or home improvement center. The only part that is tricky is the wiring between power sources... you just have to be careful that the wires aren't live when you're doing it (hook up the ground FIRST, and hots to the power sources LAST), but otherwise it's really not that complicated.

Our tent frame is aluminum conduit, so all our receptacles and light fixtures are grounded to the frame as well as the common ground in the 3-12 Romex... and both the wiring and the frame are grounded together with 00 braided copper cable to a 4' length of 1/2" Rebar embedded in the earth. This offers protection from electrical shorts as well as lightening strikes. Caution: do not store fuel canisters or firewood on/near your ground cable & spike, as fire and explosion can occur!
 
We're planning to wire the cabin the same way, except that we're replacing the SLA batteries with AGM batteries, and adding more circuits to the panel so some special equipment (like kitchen appliances and the home office) are on their own dedicated run. We've also added a 3kw generator as a backup and to provide additional juice for heavy draw items (like the log splitter) when we need them. We will also have a dedicated GFCI circuit for the exterior porch receptacle and light beside each door.

Because the battery bank is located in the loft (keeping them warm in the winter, and well vented/cool in the summer), we are wiring 30amp MALE power inlet boxes on the porch and in the loft with 3-10 Romex between them... using the male connectors rather than female connectors, with a specialized prong arrangement, ensures that someone can't accidentally plug a standard appliance into that receptacle. The heavy-duty arctic cable from the generator to the outside wall will have a standard 3-prong male plug into the  generator (2kw is only 20a, so only has a 3-prong), and a 30a female socket into the house; and the cable from the inside wall into the inverter will only have a 30a female connector on the wall side because the leads are directly wired to the inverter terminals.

We may add some additional components such as a larger freezer (AC or DC), well pumps and electric fencing that may or may not have their own dedicated power source (PV panel with battery/generator backup) depending on the draw, run distance, and electric current type. At the very least, we'll be adding a 75w PV panel dedicated to the current DC freezer and utilizing the remaining good SLA batteries as it's own dedicated back up rather than drawing from the house batteries (we only need the freezer in the summer, so power availability is not an issue).

Since the cabin isn't made of metal like the tent frame, we will be wiring all the receptacles and light fixtures to the common ground in the 3-12 Romex, installing lightning rods on the roof peak, and connecting the house wiring and rods with 00 braided copper cable to 4'  of 1/2" Rebar embedded in the earth (once the ground thaws enough!).

Both battery banks are designed to provide 800+ amp-hours at 24v, this provides us an average of 5 days between charges for normal use and up to 10 days with conservative use. A full recharge normally takes less than 8 hours running the 2kw generator, and our generator runs 8-14 hours on a gallon of gasoline depending on load and whether the eco-throttle is on. We intend to add 5 PV panels rated at 225w each (1+ kw total) which should be more than adequate to keep the batteries trickle charged AND provide us with all the power we can use during the long summer days. The addition of a 2kw wind turbine will take up the slack on cloudy days, so we don't expect to need the generator at all during the summer unless we're running some seriously heavy-draw equipment for long periods. The wind turbine and PV combo should provide ample charging of the system during early spring and late fall with rare need for the generator; and the wind turbine should reduce the frequency and duration of running the generator during our long winter nights. PV output from moonlight and snow reflection in the winter is documented up here, but we are not counting it in our plans.

So that's all things electrical for now, hope this was helpful information. Thanks for your patience.

Sunday, March 20, 2011

Insulation - Part 2

Today we finished blowing in the downstairs walls and the floor joists. We had just enough unfrozen insulation to get that done, as well as to go back and do a little bit of touch-up fill in areas that settled after we went through and palpitated the mesh vigorously. Yes, we looked kind of funny prodding and fondling our walls, but it's the absolute best way to make sure you get dense packed in every nook and cranny. It's likely that we're stuffed so tight to the gills that we'll have to compress it a bit when we go to install the drywall.

But anyway, the insulation is all done now, and we have about 5 bags worth of damp/frozen clumps spread out on the floor in front of the wood stove that we can break up and re-fluff once it's dry again in case we need to add a little more stuffing in anywhere or insulate the dog house or something LOL.

The cabin is sooooo warm and toasty; and, for the very first time, I could walk on the floor without hearing or feeling footsteps. I'm just going to do my happy hamster dance again!!